Tel: 0086 186 69798625

E-mail: saintyoldawin@163.com

Home / All / Industry News /

What is the reason for the wear of the cutting ring of the concrete pump? How to repair?

What is the reason for the wear of the cutting ring of the concrete pump? How to repair?

Mar 9,2021
1. Damaged

The cutting ring of the concrete pump is originally a vulnerable part, which is used to make it repeatedly wear and tear during the working process. Under normal circumstances, the wear rate of the cutting ring can only be reduced by improving the pumpability of the concrete. The cutting ring can be reduced by checking and tightening the nuts to ensure that the gap between the cutting ring and the glasses plate is about 2 to 4 mm. Accidental damage.

2. Maintenance

Tighten the nut under acceptable conditions to reduce the gap between the eyeglass plate and the cutting ring. If the wear is serious enough to cause leakage or pump blockage, it is better to replace the new accessories as soon as possible, otherwise the eyeglass plate will be damaged and the loss will be greater. .
truck mounted robot concrete spraying machine

Don't forget to sign up!

Find out early about all upcoming promotions and

newproducts releases

subscription