We Deliver Full-Line Concrete Equipment Solutions

Home / All / Industry News / General maintenance methods for hydraulic concrete placing boom out of running

General maintenance methods for hydraulic concrete placing boom out of running

Mar 20,2024
Ⅰ. The hydraulic concrete placing boom arm is out of control

1. The hydraulic safety valve is blocked, solution: clean

2. Internal and external leakage, cylinder seal damage, solution: replace

3. Reverse valve failure, solution: maintenance

4. Electrical failure, solution: maintenance

5. Insufficient oil pressure, solution: inspection and adjustment (completed by professionals)

6. Pressure changes in the pressure limiting valve, solution: inspection and adjustment (completed by professionals)

Ⅱ. The hydraulic concrete placing boom cannot be raised

1. The valve is contaminated or damaged. Solution: clean or replace.

2. The oil pump is contaminated or damaged. Solution: clean or replace.

3. The oil pump does not rotate. Solution: Repair and replace mechanical parts.

4. The reversing valve leaks oil. Solution: replace the seal.

Are you looking for a reliable manufacturer of down home textile products?

We can quickly provide customers with market analysis, technical support and customized services.
Contact Person
Michael Liu
Name:
Michael Liu
Tel:

+0086-186-69798625

+0086-532-89659612

Email:
WhatsApp:
8618669798625
Address:
Office: 216# THE 308 STATE ROAD, CHENGYANG DISTRICT, QINGDAO SHANDONG,CHINA. Factory: No.413# Tieqishan Road, Yuhuangling Industrial Park, Chengyang District, Qingdao, China
follow us
Please send your message to us
*Email
Mobile Phone
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.